Stamping press was moved. 80,000 lbs. A difficult move very tall and top-heavy. Awkward? Cumbersome? Indeed it would be for an average equipment handlers. We moved it 4 hours on the clock.

i

Versalift and triple lift move 70 injection mold machines 135 truckloads of equipment moved at Sterilite. Brand new and shipped from Austria the dock in davenport. LPW-I and set up. Operational Davenport. (This required a trip to Massachusetts to determine every need.) Winters stpr,s C customs red tape and the global proportions of international commerce required in common flexibility that is an LPW-I trademark.

i

Bowe machine (metal scrapping rotor.) 130,000 in motion by LPW-I. 6 hours it was a wrap.